top of page
Roseland_heroresized.jpg
PORTFOLIO

30 MW AC 35 MW DC operating photovoltaic dual axis solar facility. Whetstone successfully re-powered the facility to monocrystalline photovoltaic from the originally designed high concentrating PV, retaining dual axis tracking technology. This re-powering was completed in Q1 of 2025.

Located in the San Luis Valley of Colorado at an elevation of approximately 7000ft, this facility has excellent solar irradiance resource.

©2026 by Whetstone Power LLC

bottom of page